Mynydd Maen DNS Planning Application by RES
The application can also be viewed on the PEDW website at https://planningcasework.service.gov.wales/ using the reference DNS/3276725.
A statutory consultation period has been advertised by PEDW to enable the public, as well as statutory consultees, to submit their comments on the proposal. Anyone wishing to submit a comment on the application should do so by 19 May 2025. Representations can be submitted by email to PEDW.infrastructure@gov.wales or by post to PEDW, Crown Building, Cathays Park, Cardiff, CF10 3NQ. Comments will be assessed against the proposal and a determination made in due course.
Developments of National Significance Application Form
Environmental Statement Volume 1: Non Technical Summary
Environmental Statement Volume 2: Main Text
- Preface
- Introduction
- Design Evolution and Alternatives
- Proposed Development
- The Statutory and Policy Framework
- Landscape and Visual
- Ecology
- Ornithology
- Cultural Heritage
- Hydrology and Hydrogeology
- Traffic, Transport and Access
- Acoustics
- Shadow Flicker – Reflected Light
- Aviation and Electromagnetic Interference
- Socio-economics
- Schedule of Mitigation
Environmental Statement Volume 3: Figures
- Table of Figures
- Figure 1.1 Site Location Plan
- Figure 1.2 Planning Application Boundary
- Figure 2.1 Key Constraints and Infrastructure
- Figure 2.2 Turbine Layout
- Figure 2.3 Turbine Layout Evolution
- Figure 3.1 Infrastructure Layout
- Figure 3.2 Typical Wind Turbine Elevation
- Figure 3.3a Typical Wind Turbine Gravity Foundation
- Figure 3.3b Typical Wind Turbine Piled Foundation
- Figure 3.4 Crane Hardstanding General Arrangement
- Figure 3.5 Access Track Typical Details
- Figure 3.6 a, b, c & d Substation Building and Compound
- Figure 3.7 Site Entrance
- Figure 3.8 Typical Temporary Construction Compound
- Figure 3.9 Indicative Borrow Pit Details
- Figure 3.10 Typical Cable Trench Details
- Figure 3.11 Potential Contamination Sources
- Figure 3.12 Substation Welfare Building Wastewater Treatment and Discharge
- Figure 4.1 Planning Application Boundary & Pre-Assessed Area 10
- Figure 5.1 Site Location and Initial LVIA Study Area 35 km
- Figure 5.2 Site Location and Detailed LVIA Study Area 24 km
- Figure 5.3 Blade Tip ZTV to 35 km with Viewpoints
- Figure 5.4 Blade Tip ZTV to 24 km with Viewpoints
- Figure 5.5 Hub Height ZTV to 35 km with Viewpoints
- Figure 5.6 Hub Height ZTV to 24 km with Viewpoints
- Figure 5.7 Landscape Designations within 35 km
- Figure 5.8 Landscape Designations within 24 km
- Figure 5.9 Landscape Designations to 24 km with Blade Tip ZTV
- Figure 5.10 LANDMAP Geological Landscape Classification
- Figure 5.11 LANDMAP Geological Landscape Evaluation
- Figure 5.12 LANDMAP Landscape Habitat Classification
- Figure 5.13 LANDMAP Landscape Habitat Evaluation
- Figure 5.14 LANDMAP Visual and Sensory Classification within 24 km
- Figure 5.14a LANDMAP Visual and Sensory Classification Key
- Figure 5.15 LANDMAP Visual and Sensory Overall Evaluation with Blade Tip ZTV
- Figure 5.16 LANDMAP Historic Landscape Classification within 24 km
- Figure 5.17 LANDMAP Historic Landscape Overall Evaluation with Blade Tip ZTV
- Figure 5.18 LANDMAP Cultural Landscape Classification within 24 km
- Figure 5.19 Topography Plan to 24 km
- Figure 5.20 Principal Visual Receptors to 24 km Blade Tip ZTV and Viewpoints
- Figure 5.21 Blade Tip ZTV to 24 km (NW Quadrant) with Viewpoints
- Figure 5.22 Blade Tip ZTV to 24 km (SW Quadrant) with Viewpoints
- Figure 5.23 Blade Tip ZTV to 24 km (NE Quadrant) with Viewpoints
- Figure 5.24 Blade Tip ZTV to 24 km (SE Quadrant) with Viewpoints
- Figure 5.25 Hub Height ZTV to 24 km (NW Quadrant) and Viewpoints
- Figure 5.26 Hub Height ZTV to 24 km (SW Quadrant) and Viewpoints
- Figure 5.27 Hub Height ZTV to 24 km (NE Quadrant) and Viewpoints
- Figure 5.28 Hub Height ZTV to 24 km (SE Quadrants) and Viewpoints
- Figure 5.29 Other Wind Farms within 35 km
- Figure 5.30 Other Wind Farms within 24 km
- Figure 5.31 Cumulative ZTV with operational Oakdale Business Park, Rassau Industrial Estate, Pen Bryn Oer
- Figure 5.32 Cumulative ZTV with operational Solutia UK, ANP Newport, Nash Waste Water, G24 Solutions, Tesco Distribution Centre
- Figure 5.33 Cumulative ZTV with consented Pen-Yr-Hoel Farm, Longlands Farm
- Figure 5.34 Cumulative ZTV with in planning Mynydd Carn
- Figure 5.35 Cumulative ZTV with in scoping Mynydd Y Glyn, Twyn Hywel
- Figure 5.36 Cumulative ZTV with in scoping Mynydd Llanhilleth, Abertillery, Manmoel
- Figure 5.37 Viewpoint 1 – Cambrian Way Car Park
- Figure 5.38 Viewpoint 2 – Prescoch Lane
- Figure 5.39 Viewpoint 3 – A4042 Overbridge, New Inn
- Figure 5.40 Viewpoint 4 – Llandegfedd Reservoir
- Figure 5.41 Viewpoint 5 – B4236 Llanfrechfa
- Figure 5.42 Viewpoint 6 – Twmbarlwm
- Figure 5.43 Viewpoint 7 – Ebbw View Terrace, Newbridge
- Figure 5.44 Viewpoint 8 – B4471, Swffryd
- Figure 5.45 Viewpoint 9 – Pen-y-fan Pond Country Park
- Figure 5.46 Viewpoint 10 – St Illtyd
- Figure 5.47 Viewpoint 11 – Cefn Manmoel
- Figure 5.48 Viewpoint 12 – Pen Garn-Bugail Gelligaer Common
- Figure 5.49 Viewpoint 13 – Rhymney Valley Ridgeway Walk Mynydd Bach
- Figure 5.50 Viewpoint 14 – Cefn Eglwysilan
- Figure 5.51 Viewpoint 15 – Mynydd Machen
- Figure 5.52 Viewpoint 16 – Betws, Monnow Way
- Figure 5.53 Viewpoint 17 – Ridgeway, Newport
- Figure 5.54 Viewpoint 18 – Lodge Hill, Caerleon
- Figure 5.55 Viewpoint 19 – Pen-y-cae-mawr
- Figure 5.56 Viewpoint 20 – B4293 Devauden
- Figure 5.57 Viewpoint 21 – Llancayo
- Figure 5.58 Viewpoint 22 – Blorenge
- Figure 5.59 Viewpoint 23 – B4560
- Figure 5.60 Viewpoint 24 – Pen y Fan
- Figure 5.61 Viewpoint 25 – Mynydd Maendy
- Figure 5.62 Viewpoint 26 – Cwmbran Town centre
- Figure 5.63 Viewpoint 27 – Pantygasseg
- Figure 5.64 Viewpoint 28 – Trevethin
- Figure 5.65 Viewpoint 29 – Cefn Fforest Blackwood Showfields
- Figure 5.66 Viewpoint 30 – Mynydd Garn-Wen
- Figure 5.67 Viewpoint 31A – Cambrian Way
- Figure 5.67 Viewpoint 31B – Cambrian Way
- Figure 5.68 Viewpoint 32 – Brookland Terrace play area
- Figure 5.69 Viewpoint 33 – Raglan Castle Tower
- Figure 5.70 Viewpoint 34 – Llanhennock
- Figure 5.71 Viewpoint 35 – Ysgyryd fawr
- Figure 5.72 Viewpoint 36 – Mynydd Coety
- Figure 5.73 Viewpoint 37 – Royal Crescent, Treowen/Treowen Park
- Figure 5.74 BBNP Landscape Character Assessment 35 km
- Figure 5.75 Cumulative ZTV with Scoping Stage Abertillery
- Figure 6.1 Phase 1 Habitat Survey Area
- Figure 6.2a Bat Survey Building Surveyed and Trees Inspected
- Figure 6.2b Bat Survey Building Surveyed and Trees Inspected
- Figure 6.3 Bat Detector Locations
- Figure 6.4 Ponds Surveyed for Great Crested Newt
- Figure 6.5 Dormouse Nest Tube Locations
- Figure 6.6 Otter and Water Vole Survey Area
- Figure 6.7 Statutory Designated Sites within 10km of Site Boundary
- Figure 6.8 Non-statutory Designated Sites within 2km of Site Boundary
- Figure 6.9a Phase 1 Habitat Survey Results
- Figure 6.9b Phase 1 Habitat Survey Results
- Figure 6.9c Phase 1 Habitat Survey Results
- Figure 6.10 Bat Activity
- Figure 6.11 Adder Habitat Quality
- Figure 7.1 VPs, Viewing Arc and Survey Area
- Figure 7.2 Survey Area
- Figure 7.3 Statutory Sites within 10 km of Site Boundary
- Figure 7.4 Raptor Territories CONFIDENTIAL
- Figure 7.5 Nightjar Territories CONFIDENTIAL
- Figure 8.1 Scheduled Monuments and World Heritage Sites within 10km of the Mynydd Maen Wind Farm
- Figure 8.2 Scheduled Monuments and World Heritage Sites within 10km of the Mynydd Maen Wind Farm and in Zone of Theoretical Visibility
- Figure 8.3 Listed Buildings within the Zone of Theoretical Visibility
- Figure 8.4 Conservation Areas and Registered historic Parks and Gardens within 10km of the Mynydd Maen Wind Farm and in Zone of Theoretical Visibility
- Figure 8.5 Glamorgan Gwent Historic Environment Records and National Monument Records within 2km
- Figure 8.6 Glamorgan Gwent Historic Environment Records and national Monument Records within the wind farm boundary
- Figure 8.7 Lidar Data for the wind farm boundary
- Figure 8.8 Potential archaeological sites identified from Lidar Data within the wind farm boundary
- Figure 9.1 Drainage Catchment Areas and Receptors
- Figure 9.2 Bedrock Geology
- Figure 9.3 Peat Depth Plan
- Figure 9.4 Aquifer Bedrock
- Figure 9.5 Aquifer Superficial Deposits
- Figure 10.1 Abnormal Load Delivery Route Overview
- Figure 10.2 Abnormal Load Route from Port to Abercarn Mountain Rd
- Figure 10.3 Abnormal Road Route Abercarn Mountain Road
- Figure 11.1 Mynydd Maen Noise Contour Plot
- Figure 11.2 Cumulative Noise Contour Plot
Environmental Statement Volume 4: Appendices
- Table of Appendices
- Technical Appendix 1.1 EIA Scoping Report (Barton Wilmore)
- Technical Appendix 1.2 EIA Scoping Direction from Planning and Environment Decisions Wales (PEDW)
- Technical Appendix 1.3 Scoping Consultation Summary Table
- Technical Appendix 3.1 Carbon Balance Report
- Technical Appendix 3.2 Geo-environmental Report (Argyll Environmental)
- Technical Appendix 3.3 Outline Construction Environmental Management Plan
- Technical Appendix 3.4 Outline Borrow Pit Management Plan
- Technical Appendix 5.1 Landscape & Visual Impact Assessment Criteria
- Technical Appendix 5.2 Visualisation Information
- Technical Appendix 5.3 Preliminary Assessment of Special Landscape Areas
- Technical Appendix 5.4 Preliminary Assessment of Receptor Groups
- Technical Appendix 5.5 Viewpoint Assessment
- Technical Appendix 5.6 Residential Visual Amenity Assessment
- Technical Appendix 5.6 Figure 1 Residential Properties within 2 km
- Technical Appendix 5.6 Figures 2-20
- Technical Appendix 5.7 Detailed Viewpoint Location Plans
- Technical Appendix 6.1 Planning Policy and Legislation
- Technical Appendix 6.2 Stakeholder Meeting Records
- Technical Appendix 6.3 Survey Tables and Bat Data Analysis Methods
- Technical Appendix 6.4 Phase 1 Habitat Survey Target Notes
- Technical Appendix 6.5 Bat call identification
- Technical Appendix 6.6 Photographs
- Technical Appendix 6.7 Outline Habitat & Ecological Management Plan
- Technical Appendix 7.1a Year 1 Ornithology Baseline Report 2020-21 CONFIDENTIAL
- Technical Appendix 7.1b Year 2 Ornithology Baseline Report 2021-22 CONFIDENTIAL
- Technical Appendix 7.2 Schedule 1 Breeding Information CONFIDENTIAL
- Technical Appendix 7.3 Survey Tables
- Technical Appendix 7.4 Collision Risk Modelling
- Technical Appendix 8.1 Written Scheme of Investigation (WSI)
- Technical Appendix 8.2 Historic Environment Desk Based Assessment (HEDBA)
- Technical Appendix 8.3 Historic Environment Desk Based Assessment (HEDBA) Appendices
- Technical Appendix 8.4 Historic Environment Desk Based Assessment (HEDBA) Figures Part 1
- Technical Appendix 8.4 Historic Environment Desk Based Assessment (HEDBA) Figures Part 2
- Technical Appendix 8.4 Historic Environment Desk Based Assessment (HEDBA) Figures Part 3
- Technical Appendix 9.1 Sustainable Drainage Management Plan Report
- Technical Appendix 9.2 Coal Mining Risk Assessment
- Technical Appendix 9.3 Soil and Peat Management Plan
- Technical Appendix 9.4 Watercourse Survey Report
- Technical Appendix 9.5 Ecohydrology Impact Assessment & Remediation on GWDTEs & Peat
- Technical Appendix 10.1 Outline Traffic Management Plan
- Technical Appendix 11.1 Renewable Energy Systems (RES) Publications
- Technical Appendix 11.2 Issues Scoped Out
- Technical Appendix 11.3 Background Noise Survey Locations
- Technical Appendix 11.4 Instrumentation Records
- Technical Appendix 11.5 Derived Background Noise Levels & Limits
- Technical Appendix 11.6 Curtailment Strategies
- Technical Appendix 11.7 Assessment Charts
- Technical Appendix 11.8 Draft Planning Conditions
Design and Access Statement
- Design and Access Statement
- Figure 1.1 Site Location Plan
- Figure 1.2 Planning Application Boundary
- Figure 2.1 Key Constraints and Infrastructure
- Figure 2.2 Turbine Layout
- Figure 2.3 Turbine Layout Evolution
- Figure 3.1 Infrastructure Layout
- Figure 3.2 Typical Wind Turbine Elevation
- Figure 3.3a Typical Wind Turbine Gravity Foundation
- Figure 3.3b Typical Wind Turbine Piled Foundation
- Figure 3.4 Crane Hardstanding General Arrangement
- Figure 3.5 Access Track Typical Details
- Figure 3.6 a, b, c & d Substation Building and Compound
- Figure 3.7 Site Entrance
- Figure 3.8 Typical Temporary Construction Compound
- Figure 3.9 Indicative Borrow Pit Details
- Figure 3.10 Typical Cable Trench Details
- Figure 3.11 Potential Contamination Sources
- Figure 3.12 Substation Welfare Building Wastewater Treatment and Discharge
Planning Statement
Commons Act 2006 Section 16 Application
- Section 16 Commons Act 2006 Draft Application Form
- Figures
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Appendix H
- Appendix I
Commons Act 2006 Section 38 Application
- Section 38 Commons Act 2006 Draft Application Form
- Figures
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Appendix H
- Appendix I
Pre-Application Consultation (PAC) Report
- PAC Report
- Acceptance of Notice under Article 6 of the Developments of National Significance (Procedure) (Wales) Order 2016
- Appendix 1
- Appendix 2a
- Appendix 2b
- Appendix 3
- Appendix 4
Green Infrastructure Statement
Supplementary Environmental Information
- Cardiff Airport response – radar mitigation planning condition
- Letter of Address – Radar Mitigation Scheme
- BSG ecology response 1
- RES response letter 1
- Complete list of submission documents
- BSG ecology response 2
- Outline Public Rights of Way Diversion Strategy
- Proposed Public Rights of Way Diversion Figure
- Proposed Temporary Stockpile Storage Areas Figure
- RES response letter 2